Thursday, 3 August 2017

railings and breeze block

Some of the details are starting to get filled in, and some of the important pieces of infrastructure are ready for install. A bit of the pretty stuff and a bit of the needed stuff with this update.

The stairwell window openings are being filled in with breeze block

plug and switch wiring has begun

the propane tank that will provide fuel for the stoves. This will be going on top of the utility room on the third floor, with a hidden fill hose that runs to street level

This picture isn't as exciting for you as it is for me, but it is where the mountain of construction debris used to reside. It's gone now. the white marker on the rear wall shows the seperation between lots 1 and 2, which are for sale.


The southwest corner of the building. Stucco still has to be done on this side of the building, after our neighbours trees are trimmed. This picture shows the completed second floor railing.


This wall is where the second floor B suite kitchenette will be. Plugs and switches for the countertop and fridge areas are being installed.

Tinacos ready to be hoisted up to the rooftop. There will be two up top, that are fed by pressured water from the under-stair cistern.

Completed breeze block window

wiring begins for the kitchen locations

No comments:

Post a Comment

The Reveal

My wife's favourite part of any HGTV construction show is the reveal. So in a nod to that, I thought I better make it a good one. This p...