Saturday, 5 August 2017

Front finishing work continues, and more electrical

Work continues on the stucco work. To make room, the street side trees were trimmed up dramatically (they grow back very quickly). The false windows in the front are filled in with breeze block.

The primary electrical pony panel under the front stairwell. This panel will allow us to split utilities between the first and second floor units in the future.

view from the front of the completed breeze block windows. 2nd floor railing is also completed.

Picture is out of sequence, but here is the worker finishing the second floor breeze block in the stairwell

primary electrical panel on the main floor gets installed.

Breeze block windows complete, along with the wall in front of lot #4. Streetfront trees have been trimmed up a bunch.

Scaffold goes up on the west side in anticipation of stucco going on. While not necessary, we thought our neighbour Ramona would really appreciate bordering a pretty wall.

Another shot of the completed wall from the front.

Completed breeze block windows