Here are a few more pics as the building comes up.
 |
| view from the front. We're almost at the 2.3m stage, where another beam will go as the lintel above the first floor windows. |
 |
| The view down 'main street', from the sidewalk back to the back of the lot. It was designed this way in order to provide a good breezeway. |
 |
| View of the house from the back. Back wall and outdoor courtyard is taking shape. |
 |
| Outside the lot view. No windows on this side, since there will be another building (eventually) going up beside it. |
 |
| Worker climbing the castillo rebar. Inside of the rebar is the water main that heads up to the rooftop tinacos from the cisterna. |
No comments:
Post a Comment