Ok, so the footings are poured, now it's time for the foundation to take shape!
 |
Workers getting the rebar in place for the castillos (castles, or columns). It's a lot of steel! |
 |
More rebar placement in anticipation of the columns going up |
 |
The entire lot, viewed from the back (NE) corner |
 |
more piles of construction materials as the foundation takes shape |
 |
Ross helps a worker figure out how the slope to the front door is going to work |
 |
Angel's camp. Angel stays on site 24/7 to make sure that nobody makes off with any of our construction materials. |
 |
Forms and other materials piled on the east wall near Angel's camp
|
No comments:
Post a Comment