Well, we're pretty much wrapped until my mom and dad get back down to the site in late October, when the interior work starts. In the meantime, we've been completing a few finishing elements to both secure the property and prevent rust on the steel components.
|
Here is the front entry gate, freshly painted. We went with a gloss black for all of the painted items, in order to keep a consistent and largely neutral palate. |
|
The installed front gates, being painted. |
|
Installed front parking gate, being primed and painted. |
|
Rear driveway gate, installed |
|
Rear gate while it was under construction. |
|
Boveda beamwork is now painted black. Looks sharp, I think. |
|
more painted boveda teamwork |
|
2nd floor balcony teamwork, painted. |
|
Stairwell to top floor railing. We continued with the fish pattern all the way up. |
|
Railings at the 2nd floor turn. Silvario did a nice job on the ironwork. |
|
more detail of the railings and the fish detail |
|
View of the railings in the stairwell, capturing the breeze block window |
No comments:
Post a Comment