Saturday 22 April 2017

Rear stairwell and pour on top of the 1st level

Here are some pictures from the last week, along with some missing pictures from when the foundation was poured.

Here's where the plumbing heads towards the street. This is a picture from March.

Foundation build picture from March.





Here's the rebar going in for the foundation pour. A lot of steel. A lot of concrete.


Cement pumper truck onsite for the foundation pour





The footers being poured.

Add caption



Hand pour of concrete on the first level. The top of the boveda ceiling is visible below.

Hand pour of the concrete fill above the boveda ceiling. The lighter colour fill is actually a soundproofing - its a porous rock that absorbs sound. It goes in-between the boveda and the cement pour.

Forms for the rear stair. 

Another shot of the first floor roof pour. The plumbing sticking up is where the second floor bathrooms are.

Add caption

Hand pour of the rear stairway