So the boveda ceiling is coming right along. This is the west bedroom, where the beams run east-west. |
Workers building the ceiling. Their jig holds the bricks perfectly spaced so that they can fill in the mortar afterwards. |
This is the sewer transfer box. Sewer goes in here before it leaves to the town septic system. It's standard design, which provides a buffer against surges and back flows. |
the main hallway gets a special arch that spans the full width. |
No comments:
Post a Comment