Thursday 22 June 2017

Third floor utility room bath room and railing

The third floor continues to come along. Our goal is to get the structure complete so that we can get the waterproof membrane down and final graded concrete prior to the start of the rainy season in July.

An unexciting view of the east wall of the 3rd floor bathroom from outside. It excites me just a bit because I can see that the main water line from the cistern that goes to the tinaco is in the pillar, meaning that we've plumbed correctly.

View from atop the utility room construction, down towards the east wall railing and light tunnel. At the top, Eduardo is working on the railing wall around the stairwell.

Eduardo works on the railing wall. 

Eduardo works on the perimeter railing at the stairwell

The laundry room is coming together. the beam at 2.3m above the doorway is nearly ready to be poured.


No comments:

Post a Comment

The Reveal

My wife's favourite part of any HGTV construction show is the reveal. So in a nod to that, I thought I better make it a good one. This p...