Tuesday, 30 May 2017
Building boveda
Ok, I have lots of pics and video of boveda being built, but not much bandwidth. High res versions of all of this stuff will arrive eventually, but for now here's a teaser of Tacho and his helper building the ceiling over the front deck area.
2nd floor ceiling taking shape and 2nd floor bedroom
The meticulous detail of building the boveda ceiling on the second floor has begun. It's an interesting process (more pics and video coming!). For now, here is a look at some of the completed sections, especially the 2nd floor bedroom.
| Rear garden area shot for Mike. A worker preps and loads bricks from here up the stairs to where the ceiling construction is happening. |
| The beams that support the boveda arches. This shot is in the 2nd floor outdoor kitchen area. |
| 2nd floor kitchen area. You really get a sense of how much steel is in a building like this. Another worker carries posts to support formwork. |
| Here's a completed portion of boveda ceiling. Later, the steel beams which are primed can be painted. |
| Looking out second floor bedroom 1 towards stairwell and into the street. The electrical will be cut in in this room tomorrow. |
| Same bedroom, looking at bathroom slider door and hallway door. The bathroom hallway door is also visible. |
| Another shot of the same space. On this wall will be a closet. There will be a bulkhead above the closet that circles the perimeter of all rooms. |
front stairs, beams, and other fun stuff
It's been great being in town watching the build. Have I mentioned the mangos yet? They're everywhere. I've never been here in late May/early June, which is mango season. It seems like every other tree is a mango, and all are producing lots of fruit. So much that it's almost a hazard underfoot. And nobody told me that there were something like 20 species of mango, each with their own character. Apparently, most don't travel well, which is why we don't see them in Canada. I had no idea. I don't know how many mangos is too many, but I haven't got sick of them yet. It's all mango, all the time.
Anyways... Onto the build update.
Anyways... Onto the build update.
| Meet our build team, having a break in the shade in the afternoon under a mango tree. A good group of guys that work hard. |
Ever wonder how concrete stairs are built? It begins with the platform forms. Then the horizontal rebar is drilled into the wall and installed, about one per stair. Then a foot is poured on the first step, and the running rebar is cemented in. These are the ones you see sticking up. After they've set, they're bent into the stair and tied into the other rebar in preparation for pouring.
| horizontal bars are anchored at the bottom of the staircase, soon to be bent into and tied into the other rebar. |
| Formwork for the next part of the stair is being set up. |
| Stairs as viewed from the second floor |
| Arch that was created improperly is complete and is set up |
| Arches under construction on the second floor balcony |
| Tacho creates the form for the arch that he's building out of bricks and mortar. He'll build this form which will support the bricks as they dry. |
Friday, 26 May 2017
Video tour of the build
I had a chance to do a walkthrough of the build while the workers were on lunch today. It's a more complete view of whats being built, along with the neighbourhood around us. There are 3 parts. Because I am in a part of Lo D that has poor internet, it will be a while before the other two parts are uploaded.
Part 1, the house as seen from the street
Part 2, the main floor
Thursday, 25 May 2017
Finally onsite to check out the build
So my dad and I got into town yesterday. It's my first look at the build in person, which was exciting. It was great to walk through a space that I have imagined in my mind for so long. It feels like everything is sized and scaled really well, which I attribute to having some great design help.
This set of pictures captures some of the build detail, as well as hopefully capturing what the views might look like.
This set of pictures captures some of the build detail, as well as hopefully capturing what the views might look like.
| Second floor looking north over the schoolyard |
| Second floor looking west into Juan's yard |
| second floor looking east over 'Chicago House' |
| Third floor looking west to the ocean |
| Third floor looking northwest towards the ocean |
| Third floor looking north towards north hill |
| third floor looking east towards Chicago house and the mountains |
| third floor looking east towards the mountains |
| third floor looking northwest towards the ocean |
| Third floor looking north over the second floor and towards the schoolyard |
| third floor looking north over the street. Say hi to our builder, Jésus! |
| Third floor looking southwest towards the ocean. This area will have one of the best views, but I'm too chicken to walk the beams to the building corner to take a pic. |
| view of the property from the northeast corner of the lot |
| One of the best parts of being here in May is that the mangos are ready. This mango tree that hangs into our lot is postively lousy with the tasty little buggers. Lunchtime! |
| View from inside the first floor kitchen, out past the outside kitchen |
| View from the street. The basket-handle arch on the second floor stairwell window will be changed to the same point-arch as the openings on the first floor. |
| First floor kitchen area looking east |
| first floor kitchen area looking east |
| looking up the rear stairs to the second floor and the second floor terrace. |
Wednesday, 17 May 2017
second floor structure taking shape
Things are coming along, although communicating from a distance about change details has proven to be challenging, even in this internet age. We'll be back onsite (and hopefully, back on track) when we fly back down next week. In the meantime, here are some progress pictures.
Tuesday, 2 May 2017
second floor structure continues
Subscribe to:
Posts (Atom)
The Reveal
My wife's favourite part of any HGTV construction show is the reveal. So in a nod to that, I thought I better make it a good one. This p...
-
Ok, so a few weeks between posts. The place has been a mess with tiling, so my mom wasn't keen to take many pictures of that. She's ...
-
So the tiling continues. With more than 600 sq meters to put down between floors, walls, counters, and shelves, it's time consuming work...
-
Well, we're pretty much wrapped until my mom and dad get back down to the site in late October, when the interior work starts. In the me...













